The Borough of West Chester Police Department is growing in response to increasing community and service demands. The existing facility is
undersized and in need of targeted improvement however; must maintain full operation throughout the construction process. The East side of the building has been targeted for the expansion with an approximately 11,500 sq. ft. addition to the existing structure.
- Creation of a flexible expansion with the ability to support growth over time
- Use of durable materials in safe installations in all operational areas
- Security focused design to provide passive and active visual control of all spaces and entrances
- Fully accessible/ADA compliant design
- Sally port area – dual bay with each bay independently secured
- Recessed lighting and other fixtures in operational areas
- Doorways, corridors, and elevators adequately sized for emergency equipment
- Life safety and user safety emphasis in design of all areas