This was a complete renovation of the auditorium. It included removing the systems new stage wall and all of the finishes and new HVAC System. The demand was for an acoustical value. An acoustical engineer was hired. All drywall along with the panels throughout the building were designed for acoustics along with aesthetics. In addition, we were designed a four classroom infill for the Central Bucks West High School.
close